Update docs for Gap 2 GUI Settings completion (5 of 7 gaps closed)

This commit is contained in:
Jason
2026-03-19 23:58:37 +02:00
parent 7cdfa486e5
commit 02b3b68e00
3 changed files with 14 additions and 4 deletions
+1 -1
View File
@@ -112,7 +112,7 @@
<h2>Report Currency Notice</h2>
<ul>
<li>The current routed production-target baseline is <strong>Build 20 (v0.1.3-build20)</strong> with all timing constraints met and 7x setup slack improvement over Build 18.</li>
<li>Architectural gaps 3 (Safety), 4 (USB Read Path), 5 (BRAM Reset), and 7 (MMCM) are closed. Gaps 1 (CFAR), 2 (GUI), and 6 (CDC-15) remain for post-bring-up or pre-tuning.</li>
<li>Architectural gaps 2 (GUI Settings), 3 (Safety), 4 (USB Read Path), 5 (BRAM Reset), and 7 (MMCM) are closed. Gaps 1 (CFAR) and 6 (CDC-15) remain for post-bring-up.</li>
<li>FPGA regression: 18/18 pass. MCU regression: 20/20 pass (15 bug-fix + 5 Gap-3 safety).</li>
<li>Detailed Build 20 engineering reports are on the remote Vivado host at <code>~/PLFM_RADAR_work/vivado_project/reports_build20/</code>.</li>
<li>The artifact inventory above is intended to stabilize day-0 execution even when detailed internal engineering reports stay outside the public docs site.</li>