d5d28e9f1c
Build 25 results (MTI + DC notch integration): - WNS +0.132 ns, WHS +0.058 ns (all domains PASS) - 9,252 LUTs, 12,488 FFs, 17 BRAM, 142 DSP, 0.753 W - MTI cost: +694 LUTs, +2,104 FFs, 0 BRAM, 0 DSP - Bitstream: radar_system_top_build25.bit (production-safe) - 23/23 FPGA regression, 29/29 MTI checks, 3/3 real-data co-sim Updated reports.html (15-point Build 25 report), implementation-log.html (timeline entries for production fixes, CFAR, MTI), and release-notes.html (new tagged releases, gap status update).