Files
PLFM_RADAR/docs
Jason d5d28e9f1c Build 25 engineering report: MTI canceller + DC notch timing PASS
Build 25 results (MTI + DC notch integration):
- WNS +0.132 ns, WHS +0.058 ns (all domains PASS)
- 9,252 LUTs, 12,488 FFs, 17 BRAM, 142 DSP, 0.753 W
- MTI cost: +694 LUTs, +2,104 FFs, 0 BRAM, 0 DSP
- Bitstream: radar_system_top_build25.bit (production-safe)
- 23/23 FPGA regression, 29/29 MTI checks, 3/3 real-data co-sim

Updated reports.html (15-point Build 25 report), implementation-log.html
(timeline entries for production fixes, CFAR, MTI), and release-notes.html
(new tagged releases, gap status update).
2026-03-20 16:59:30 +02:00
..